Complete Unit Test is a test aimed at checking mechanical integrity of the pump when assembled as a complete unit with all auxiliaries. As such, regardless of the pump type (split casing or otherwise), please note salient features of Complete Unit Test :
- It is carried out with contract drivers, contract coupling, contract mechanical seals, contract lube oil system skid (as applicable), contract seal support system skid (as applicable), contract vibration and temperature monitoring system components (probes typically).
- It is not the intention of checking hydraulic performance of the system, which is usually carried out through Performance Test. In this test, bearing vibration, seal leakage and noise are usually checked.
- All contract components are mounted and assembled at pump manufacturer's shop and then this machine is run for 4 hours or so.