WRH
Mechanical
- Jun 20, 2002
- 17
I have two drawings, both single sheets, (dwg_1 & dwg_2), and two models, (model_1 & model_2). Model_2 was created using the merge command with model_1. Now the engineer wants to make a two sheet drawing of dwg_1 where the second sheet is dwg_2. So the end result would be dwg_1 sheet 1 of 2 and dwg_1 sheet 2 of 2. Can this be done? If so how. TIA for your help.
WRH
WRH