J
JBeckley
Guest
We've recently initiated ILink, and we want to initiate a stored Color Map.
Is there any way to move the load point of Pro through ILink so that the color map, config.pro and Mod_Val.dtl for drawing setup loads?
Is there any way to move the load point of Pro through ILink so that the color map, config.pro and Mod_Val.dtl for drawing setup loads?