Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

Cold drawn vs hot rolled superheater seamless tubes

Status
Not open for further replies.

wayuu1981

Mechanical
Joined
Sep 15, 2006
Messages
47
Location
CO
We are trying to purchase some SA-213 TP304H cold drawn tubes, 2 in diameter, 0.220 in thickness, in order to replace the secondary superheater (platen) panels in our pulverized coal fired 150 net MW boiler.

the design steam outlet properties are: 1880 psi, 1000 F

As we are running out of time to get the panels ready previous to plant stop, it's been hard to find the required material, and the delivery time is about 6 months. We have the option to replace this material for a SA-213 TP347H Hot rolled that can be delivered in about 40 days.

Is this option an equivalent and reliable replace of the original tubes?

Any advice will be appreciated.





Javier Guevara E.
Projects, Mechanical Engineer
 
The HR tubes will have rougher finish and looser tolerances.
If they meet the design spec then they should work, but may require more shop time to fit, weld, and extra cleaning.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, Plymouth Tube
 
Hot rolled SH boiler tubes will perform just fine.
 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top