I am encountering 8"std and 22" Sch30 P22 pipe material(P.No.5A Gr.1)to be fabricated under ASME SecI: Boiler Proper at site. The data reports from the boiler manufacturer state that the parts have been fabricated in accordance to ASME SecI: 1998 and Addenda to 1999.
For P22 material, SecI: 1998 has a diameter restriction of < 4" and thickness restriction of <5/8" for PWHT . In SecI:2001, the diameter clause has been DELETED.
Do I have to follow the 1998 code and still do the PWHT or can I get away without doing the PWHT as per 2001 code?
For P22 material, SecI: 1998 has a diameter restriction of < 4" and thickness restriction of <5/8" for PWHT . In SecI:2001, the diameter clause has been DELETED.
Do I have to follow the 1998 code and still do the PWHT or can I get away without doing the PWHT as per 2001 code?