bisonee
Electrical
- Oct 6, 2006
- 7
I am doing a design in arkansas. Do to limited room we are looking at putting a transformer over a non pressurized storm sewer pipe. Is there and clearance requirments for that with respect to the pipe and electrical equipment including conductors in conduit. Unfortunetly this is not my design. It is a VE proposed by the contractor and approved by the owner.