waytsh
Structural
- Jun 10, 2004
- 373
When making a tension connection between a cast-in-place pile and the base slab with rebar dowels is there a recommended safety factor? ACI 543 seems to indicate using a factor of 0.5 when cacluating your tension steel. ACI 318 and 350 call for 0.9 for tension connections. I am also looking for some recommened details. I am considering bent rebar with the required emebedment and brought up past the bottom mat or a headed plate with a heavy plate washer. Does anyone know of any reasons to use one over the other or maybe a third type that I haven't mentioned?
Thanks!
Thanks!