- Jan 30, 2014
- 802
Reviewing steel shop drawings and calcs and some of the braced frames have chevron braces. The CD's (not designed by my company) show typical details for their braced frame connections to be designed by the detailer. However, their chevron bracing connection (mid-span of beam) says that the joint shall be analyzed/designed using the Uniform Force Method. I don't think that the UFM rational procedure applied to this type of connection. I don't even know how they can attempt to design the joint with UFM, as the nomenclature applies to the beam-column interface.
What should I be watching out for when reviewing these calcs?