Dear all,
I have a dilemma and need your help
I have an existing bursting disc [independent] on the reactor in the existing plant which I want to check if it has got enough relieving capacity for the two phase release scenario I am looking into.
Reactor design pressure: 6barg
Bursting disc: 10” bursting disc set at 2.75barg and discharge line 10”
Bursting disc discharge pipe: 1.5m vertical (1off) rise straight from reactor nozzle, 3off long radius elbows and total discharge length of 6m discharges to a dump tank. [Note: I am sure, you don’t need sketchJ]
Two phase release scenario: complete failure of a reactor steam coil below liquid level causing two phase flow release
Two phase release rate: 480kg/sec [of which liquid release rate is 478 kg/sec and vapour is 2kg/sec]
I believe, there are two options and it seems only one option could be right?
Option#1: With above two phase release rate [480kg/sec], the two phase flow pressure drop [using Lokhart Martinelli model for two phase flow pressure drop], in the discharge pipe line is about 90% of set pressure i.e. 2.5barg. This proves that the given 10” bursting disc OK.
Option#2: If I use Omega Method or HEM Method to estimate the required bursting disc diameter, it seems that the 10” bursting disc is not enough and I need about 23” bursting disc!!!
Which option is correct? Am I missing anything?
Waiting for expert comments
Thanks.
I have a dilemma and need your help
I have an existing bursting disc [independent] on the reactor in the existing plant which I want to check if it has got enough relieving capacity for the two phase release scenario I am looking into.
Reactor design pressure: 6barg
Bursting disc: 10” bursting disc set at 2.75barg and discharge line 10”
Bursting disc discharge pipe: 1.5m vertical (1off) rise straight from reactor nozzle, 3off long radius elbows and total discharge length of 6m discharges to a dump tank. [Note: I am sure, you don’t need sketchJ]
Two phase release scenario: complete failure of a reactor steam coil below liquid level causing two phase flow release
Two phase release rate: 480kg/sec [of which liquid release rate is 478 kg/sec and vapour is 2kg/sec]
I believe, there are two options and it seems only one option could be right?
Option#1: With above two phase release rate [480kg/sec], the two phase flow pressure drop [using Lokhart Martinelli model for two phase flow pressure drop], in the discharge pipe line is about 90% of set pressure i.e. 2.5barg. This proves that the given 10” bursting disc OK.
Option#2: If I use Omega Method or HEM Method to estimate the required bursting disc diameter, it seems that the 10” bursting disc is not enough and I need about 23” bursting disc!!!
Which option is correct? Am I missing anything?
Waiting for expert comments
Thanks.