All,
We are attempting to use 4 load cells at corners of a railcar to determine its CG.
Using 3 points instead (which I'd rather do because it's statically determinate) is not feasible.
A discussion on thread404-117973 touched on this. Does anyone have a repeatable method of establishing the CG position (in plan) using the 4 load cell readings? We even have the capability of raising and lowering 1 of the corners slightly and taking new readings. These additional ones could provide the missing equation!
Any ideas?
tg
We are attempting to use 4 load cells at corners of a railcar to determine its CG.
Using 3 points instead (which I'd rather do because it's statically determinate) is not feasible.
A discussion on thread404-117973 touched on this. Does anyone have a repeatable method of establishing the CG position (in plan) using the 4 load cell readings? We even have the capability of raising and lowering 1 of the corners slightly and taking new readings. These additional ones could provide the missing equation!
Any ideas?
tg