Hi
I have a quick questions regarding concrete detailing. I have a cantilevered ground beam which is supporting a column load of 100kips. I am designing by strut-and-tie method.
I have resolved my free body diagram so that I need to transfer a tension force of 63kips into a cast-in-place pile.
To detail this joint, I was thinking to cog the top reinforcement down full length of the ground beam and provide 30 bar diameters extension of the pile reinforcement into the ground beam. These two bars are not in a direct contact lap splice however, would this be sufficient to transfer the force in the tension pile or is this detailing in-sufficient.
All help will be appreciated.
Regards
I have a quick questions regarding concrete detailing. I have a cantilevered ground beam which is supporting a column load of 100kips. I am designing by strut-and-tie method.
I have resolved my free body diagram so that I need to transfer a tension force of 63kips into a cast-in-place pile.
To detail this joint, I was thinking to cog the top reinforcement down full length of the ground beam and provide 30 bar diameters extension of the pile reinforcement into the ground beam. These two bars are not in a direct contact lap splice however, would this be sufficient to transfer the force in the tension pile or is this detailing in-sufficient.
All help will be appreciated.
Regards