Post-tensioned bridge decks are constructed with BONDED(grouted) tendons, so the cutting and demolition of such elements are not a big deal - assuming the grouting was good etc. If for some reason the tendons are UNbonded (usually only used in building structures in the USA and other markets)), then you need to take a few additional precautions before severing the strands.