Working in a power station where the switchyard is 500KV.The bus bar is in two section with a tie breaker/bus sectionalizer inbetween.
Presently the bus bar has high impedence bus bar differential protection with zone I covering one half of the bus and zone II covering second half.
In an upgradation project the equipment on one side of sectionalizer has been changed.Protection now is low impedence.
This will mean low impedence on one side of tie breaker and high impedence on second side.
IS THERE ANY DRAW BACK?
Presently the bus bar has high impedence bus bar differential protection with zone I covering one half of the bus and zone II covering second half.
In an upgradation project the equipment on one side of sectionalizer has been changed.Protection now is low impedence.
This will mean low impedence on one side of tie breaker and high impedence on second side.
IS THERE ANY DRAW BACK?