broth
Aerospace
- Feb 23, 2013
- 1
What is the best procedure for building on top of a cleared-off layered limestone bedrock? As far as I can tell, this layered limestone goes down for well over 10 feet.
I want to build a house and workshop on top of this rock formation.
I want to build a house and workshop on top of this rock formation.