donovanb2
Electrical
- Mar 13, 2003
- 9
I need to know where I can find some device that will load (4) 1/4-28*1.5" SHCS that are 90 deg in a 4" array. After they are loaded they need to be impacted tight. I will need to vary the torque on the bolts, but should be in the range of 20-50 lbs. I'm looking at a cycle time of 30 secs.