BONILL
Structural
- Mar 9, 2010
- 74
While designing special moment frame in ETABS, I have the following situation:
I have 20"x20" reinforced concrete columns supporting 16" Wide x 36" Deep beams on the top floor. Since there is no column above the joint, and at least 3 beams frame into my column at every joint, the Beam/Column Moment Capacity Ratio is exceeded. I would need too big of a column section to get it to work. Please advice as to any other possible solutions.