Hi experts,
Is it posible to have only one datum for a true position callout as shown in the picture? Is the 2*SQR(x^2+y^2) formula still valid in this case? If so, then the .720 will have +/- 0.020 tolerance? Thanks.
Cloud
Is it posible to have only one datum for a true position callout as shown in the picture? Is the 2*SQR(x^2+y^2) formula still valid in this case? If so, then the .720 will have +/- 0.020 tolerance? Thanks.
Cloud