BrianE22
Specifier/Regulator
- Mar 21, 2010
- 1,070
I'm used to seeing balloons with item numbers that link to a table showing the corresponding part number on an assembly drawing. A young lad I hired to do some Solidworks assembly drawings asked why he shouldn't just put the part numbers on the assembly drawing. These days, when it is just as easy to change a CAD drawing as it is to change an Excel spreadsheet, I'm not sure there is any need to use balloons with item numbers over just having the part number on the drawing. Any thoughts?