tbone73
Structural
- Apr 2, 2009
- 51
For the foundation design experts. I have a cast in place post tensioned building with frames spaced at 27 feet typical and 62 feet 2 span beams supporting 7 inch slab. The foundation type is auger cast pile groups with individual pile caps. Under frame action alone the dead and live load produce large column shears and consequently large reactions on the pile caps. Large enough in fact to dictate oversizing the pile groups to limit diplacements. However we are considering using grade beams as ties from the exterior pile caps to the interiors to limit the displacements. The ties will be in tension. Does anyone have some similar experiences with using ties in foundation? Thanks for your input.