Jul 28, 2009 #1 drile007 Structural Joined Jul 14, 2007 Messages 194 Location SI At which [α] angle we don’t need “upper” formwork to avoid fresh concrete “amassing”? Thanx in advance PS: Hope amassing is the proper word which describe the problem.
At which [α] angle we don’t need “upper” formwork to avoid fresh concrete “amassing”? Thanx in advance PS: Hope amassing is the proper word which describe the problem.
Jul 28, 2009 Thread starter #2 drile007 Structural Joined Jul 14, 2007 Messages 194 Location SI Upvote 0 Downvote
Dec 26, 2009 #3 Speedycrete Civil/Environmental Joined May 31, 2006 Messages 18 Location CA It depends very much on the slump. Also many other factors, such as mix design, aggregate gradation, w/c ratio, admixes, 'age' of concrete, ie: what point is the hydration reacytion at? Keep in mind that stiff concrete is not easy to work with. Upvote 0 Downvote
It depends very much on the slump. Also many other factors, such as mix design, aggregate gradation, w/c ratio, admixes, 'age' of concrete, ie: what point is the hydration reacytion at? Keep in mind that stiff concrete is not easy to work with.