Dear all
our company as an EPC contractor singed a contract with a vendor in order to manufactured a Gas dryer and let us have U2 stamp on it. the vendor asked us to issue UDS singed by AI inspector(user Design Specification singed by AI). now there are two question which need to be answered:
1- is it necessary to issue a singed UDS in order to have U2 stamp?
2- how can we have AI stamp on our UDS?