It likely depends upon the application and location.
Perhaps an example requiring a stamp would be a municipal methane disposal facility. Facilities for the public would be more likely to require a stamp.
I don't see a PE stamp on most area classification for plants in Texas. However, civil/structural drawings are typically stamped for the same projects.