I appreciate if somebody can help me out with direction on this,
I am involved in a project that the owner temporary wants to remove one leg/column of a mezzanine and I proposed the best is shoring it temporary at the location close to the leg is to be removed temporary.
I was expecting the shoring contractor to take care of the floor slab with providing proper cribbing or mud matt. Which I don't know which is better cribbing or mud mad?
Seems the contractor is not component. Can some body help me out to determine the correct protection of the concrete floor slab?
Some information are as following
1- The load that shoring is supposed to handle is 6000 lbs vertical load.
2- The contractor came up with "This shoring will consist of two post shores and a steel beam pushing against the point in which the two
structural horizontal beams connect to the outer W8x12 beam that is running perpendicular" Please See attached - 2 attachments
3- Floor slab is 12" two way slab #5 @12 Top and bottom
Now mud matt or cribbing? what size? how many layers of cribbing if we go by cribbing?
Thank you for your great help.
I am involved in a project that the owner temporary wants to remove one leg/column of a mezzanine and I proposed the best is shoring it temporary at the location close to the leg is to be removed temporary.
I was expecting the shoring contractor to take care of the floor slab with providing proper cribbing or mud matt. Which I don't know which is better cribbing or mud mad?
Seems the contractor is not component. Can some body help me out to determine the correct protection of the concrete floor slab?
Some information are as following
1- The load that shoring is supposed to handle is 6000 lbs vertical load.
2- The contractor came up with "This shoring will consist of two post shores and a steel beam pushing against the point in which the two
structural horizontal beams connect to the outer W8x12 beam that is running perpendicular" Please See attached - 2 attachments
3- Floor slab is 12" two way slab #5 @12 Top and bottom
Now mud matt or cribbing? what size? how many layers of cribbing if we go by cribbing?
Thank you for your great help.