Nasim12345
Industrial
- Apr 25, 2017
- 53

Dears
I need your advice pls. We have Air volume tank available in our plant & PSVs are available in each air volume tank. However, these are not yet added in our PM schedule. As per ASME code or API, is it mandatory that these air volume tank PSVs must be calibrated in every 3 year / 4 years? Is it mentioned anywhere in the industrial code that, it is a mandatory requirement? Find attached photo for Air volume Tank