Jameschen6
Geotechnical
- Jun 28, 2008
- 25
I like to continue the discuss starting with the thread "Grain Size Distribution by Hydrometer".
According to the Ontario standard. The soil will be oven dry at begining. after having the total weight, the sample will be grinded with a pestle. Sieve it over 2mm sieve. The portion retained will be washed and sived again. The percentage of the soil passing can be calculated then. The sub-sample will be taken from the portion passing the 2mm sieve for the hydrometer analysis.
My question is that the sample for the hydrometer has already been oven dried. For the soil thich has both coarse and fine portion is necessary for these strps. For instance, the maxnominal size of the particle is 10mm and there is significant amount of silt/clay portion.
I can't recall the difference between Ontario standard and ASTM on this aspect.
Any coments? Thank
According to the Ontario standard. The soil will be oven dry at begining. after having the total weight, the sample will be grinded with a pestle. Sieve it over 2mm sieve. The portion retained will be washed and sived again. The percentage of the soil passing can be calculated then. The sub-sample will be taken from the portion passing the 2mm sieve for the hydrometer analysis.
My question is that the sample for the hydrometer has already been oven dried. For the soil thich has both coarse and fine portion is necessary for these strps. For instance, the maxnominal size of the particle is 10mm and there is significant amount of silt/clay portion.
I can't recall the difference between Ontario standard and ASTM on this aspect.
Any coments? Thank