301-05 states
1.6.3 Testing responsibilities of Contractor
1.6.3.2.d Provide and maintain adequate facilities on
the project site for safe storage and initial curing of concrete
test specimens as required by ASTM C 31/C 31M for the
sole use of the testing agency.
Obviously I don't have 301-10 yet. I've heard that the responsibility for the initial curing environment has been shifted to the testing labs in the 301-10.
Any truth to this?