EngineerofSteel
Structural
- May 18, 2005
- 156
How are you accounting for the global increase in seismic activity?
Earthquakes have increased. Has anyone modified their design procedures to account for the increased probability of seismic events?
I am being extra cautious in considering building design, and especially connections. I've been reading and improving my design process.
I've been looking at buildings that failed.
What are others doing?
Earthquakes have increased. Has anyone modified their design procedures to account for the increased probability of seismic events?
I am being extra cautious in considering building design, and especially connections. I've been reading and improving my design process.
I've been looking at buildings that failed.
What are others doing?