For new plate you refer to the material specification and associated tolerances and workmanship.With that said, you have to inspect the incoming plate and ensure the wall thickness of the new plate beneath the pitted surface, which should be removed, still remains above the required minimum design thickness. Otherwise, I would reject the plate.