I'm working with a 90 year old composite mid-rise in Alabama. I actually have drawings!!!
The drawings for the concrete joist floor systems use the following nomenclature in the Slab Schedules:
Tile & Joist:
T. + C. = 6" + 2-1/2"
Joist:
5" @ 25"
Then in the framing plans there is nomenclature like:
6"M.T. + 2-1/2"C
Any ideas?
The drawings for the concrete joist floor systems use the following nomenclature in the Slab Schedules:
Tile & Joist:
T. + C. = 6" + 2-1/2"
Joist:
5" @ 25"
Then in the framing plans there is nomenclature like:
6"M.T. + 2-1/2"C