Augercast piles do not use casings, they have the 'hole' held open by the grout that is pumped in. Since the grout uses sand as it's only aggregate, it allows for the cages to be placed.
If your piles are 90 feet deep, then the minimum cage length should be at least 30 feet (1/3 total length) depending on the seismic site class. Proper use of centralizing devices and an appropriately design grout mix will allow for reinforcing cage ease of placement.
As a side note, some projects in Florida require full length cages, and their piles can exceed 100 feet. The high water table prevents the grout from curing very quickly.