Sorry if this is the wrong thread, but I'm just looking for help.
I'm trying to find out if there are any standards out there (AWS, ASME, ASTM, ISO, etc.) that specify the requirements for the finish (grinding, pickling, etc.) and welding of 5000psi hydraulic piping in a field installation/assembly.
6000lb full socket weld fittings will be used and all pipes will be butt welded as necessary.
Piping material is sch40 carbon steel.
Any help would be greatly appreciated.