TrevorP
Chemical
- Mar 25, 2002
- 142
We have had an emergency shutdown on our plant, and need to get in a new piece of pipework quickly to replace an economiser that will be sent for repair. The pipework is 12" nb, and is for flue gases at low pressure <<1 bar, but high design temperature (810°C, 1490°F). I believe that the ideal pipework is 304H, but this is long delivery. Will 304L be OK in the short term (Say 2-3 months running)? What will be the failure mode, i.e. could the pipe potentially rupture catastrophically, or is it more likely to lead to a gradual leakage at the flanges?