Tek-Tips is the largest IT community on the Internet today!

Members share and learn making Tek-Tips Forums the best source of peer-reviewed technical information on the Internet!

  • Congratulations MintJulep on being selected by the Eng-Tips community for having the most helpful posts in the forums last week. Way to Go!

2 STORY OFFICE BUILDING 1

Status
Not open for further replies.

joemarch

Structural
Joined
Jul 20, 2004
Messages
54
Location
US
I have a 2 story office building (approximately 60'x220') with the floor framing being precast plank and the roof framed with bar joists. The grade along one side (the 220'dimension) is all the way up to the precast. So basically its a walk out basement.

What is the easiest way to account for the unbalanced load from the soil? Would it be the easiest to treat the back wall as a cantilevered retaining wall? Or, try to take the loading out in masonry shear walls? I have limited cmu walls,so this might be tough to do.

Thanks for all your help!

 
Status
Not open for further replies.

Part and Inventory Search

Sponsor

Back
Top