You are right that i am talking about construction joint but not cold joints.
Thank you for your information but i have to tell about an idea answering my question.
In Turkey, for the beams, many engineers think that 1/4 of the span from the supports are good poits for construction joints.(This is nearly similar to your knowledge) but one of my friend who is engineer too, insist on choosing construction joints in the middle of the beam and in the middle of slab if the case is UDL. (He says this is the way in America)
This is mainly due to the assumption that in the middle where moment is max., one side of the concrete doesnt work. At that side,where concrete doesnt work, only steel works. And on the other side concrete works for compression absolutely. For the all cases nobody can oppose to the fact that workmanship is really important. Becouse where the concrete take compression the joint should be resistant to the edge cracks. So, for those types of cracks may be additional precoutions should be taken. And for the other side, reinforcment might be needed to increse.
According to this idea, your reply would be appreciated.
Thank you for your sharing indeed.
Mehmet serif