Sathre
Civil/Environmental
- Jan 31, 2014
- 15
I'm comparing 2, 10 & 100yr existing events to 2, 10, & 100yr proposed events for an infiltration basin design. I can't figure out why my rates work for the 2 & 100 events, but the 10yr existing is greater than the 100yr existing. I've never had this happen before. Does anyone have an idea of what might be going on? It's a small residential site - empty lot developing 1 single family home.