TLDR: I think we messed up a foundation, anything I can do with masonry walls to mitigate settlement concerns?
In the last week, foundations were poured for my own single storey dwelling, 350mm thick, 1m wide, foundation design being 35N concrete reinforced with A393 mesh on the bottom.
Despite the excavator driver and building certifier being 'relatively' happy with the founding stratum, I just can't shake an unease with the founding soil under a gable end of the house which I feel was appreciably softer than the remaining house. I should have been more assertive before pouring, but we are where we are.
So I'm looking for anything I can do to reinforce the structure as it is built. The wall make up will be generally concrete cavity blocks with 100m leaves, supported by a rising wall of a concrete filled cavity or 100% blocks.
As a mitigation against settlement, I've been looking at mortar bed reinforcement, which is rarely (if ever) used for dwellings of this type where I come from.
Can anyone suggest other mitigations I could apply, or recommend an installation regime for the bed reinforcement?
In the last week, foundations were poured for my own single storey dwelling, 350mm thick, 1m wide, foundation design being 35N concrete reinforced with A393 mesh on the bottom.
Despite the excavator driver and building certifier being 'relatively' happy with the founding stratum, I just can't shake an unease with the founding soil under a gable end of the house which I feel was appreciably softer than the remaining house. I should have been more assertive before pouring, but we are where we are.
So I'm looking for anything I can do to reinforce the structure as it is built. The wall make up will be generally concrete cavity blocks with 100m leaves, supported by a rising wall of a concrete filled cavity or 100% blocks.
As a mitigation against settlement, I've been looking at mortar bed reinforcement, which is rarely (if ever) used for dwellings of this type where I come from.
Can anyone suggest other mitigations I could apply, or recommend an installation regime for the bed reinforcement?