×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

grouted rip rap

grouted rip rap

grouted rip rap

(OP)
I am inquiring for a co-worker.  Does anyone have a specification for grouted rip-rap?  Thanks for any help.

RE: grouted rip rap

What is the application? Riprap sizes?

RE: grouted rip rap

Concrete for grouted riprap Type I shall be an approved batch per MAG Standard Specifications and shall develop a minimum 2,500 psi compressive strength within 28 days.  Add 1.5 pounds per cubic yard FIBERMESH, or approved equal, fibrous reinforcing.

Wash the stone free of fines or soil which would affect the grout bond.  The concrete grout shall be placed by injection methods by pumping under low pressure, positive displacement methods, through a 2-inch maximum diameter hose to ensure complete penetration of the grout into the stone layer.  The voids at the surface, as detailed on the drawings, will not be grouted unless designated.  Grout thickness shall be as follows:

Type    Grout Thickness    Max. Stone Projection
I    9 inches    4"
II    18 inches    6"


The maximum stone projection is the projection of the maximum size stone above the finished grout surface and is used to verify adequate grout thickness.

The operator shall be able to stop the flow and will place grout in the voids and not on the surface of the rock.  Clean and wash any spillage before the grout sets.  A "pencil" vibrator will be used to make sure all voids are filled between and under rock. The intent is to fill all voids from the subgrade level through the rock layer.  In all cases, grout must penetrate to subgrade.  The pencil vibrator may be used to smooth the appearance of the surface.  The grout mix shall be stiffened and other measures taken to retain the grout in steep locations.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close