INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Foundations on clay terraced terrain

Foundations on clay terraced terrain

Foundations on clay terraced terrain

(OP)
if i have an existing villa on a soft clayish terrain and would like to excavate 4.0m from its lowest side by circa 8.0 m deep. any suggestions on how to contain the movement of the upper villa ??? seems like the latter has a concrete platform.

RE: Foundations on clay terraced terrain

You will have to brace the cut.

RE: Foundations on clay terraced terrain

(OP)
thanks chipB for your valuable interest. but this is exactly my problem. my current idea is 2 drill into the clay a series of 1.0m diameter piles at circa 2 to 3m intervals depending on the anlalysis. this done i would run a cross member to tie the whole lot together against the lateral load being imposed by the upper load. assuming enough pile anchorage i would then be able to excavate the site to prepare for my new raft foundation. what do u reckon??

RE: Foundations on clay terraced terrain

you said an 8m cut.  is this 8m below the bottom of the existing fdn or from the top?  is your new raft fdn. going to be 8m deep?  if you're already taking about piles, why not install them where your new fdn is going and cantilever your raft over these piles towards your villa.  would it still need to be 8m deep?

RE: Foundations on clay terraced terrain

(OP)
Indeed the depth of excavation is 8m below the bottom of d existing raft foundation of the upper villa. after excavating the 8m depth of foundation i will be in a position to cast my raft foundation which presumably is going to be circa 1.0m deep. the pillars will by this time be subjected to a considerable side thrust which i need to derive to be able to size and detail the pillars.. compriende?? :)

RE: Foundations on clay terraced terrain

Here, we have push piers, that could be pushed into the ground until they acheived the required capacity.  They cost about $1000 each.  This would take the verical forces away from the immediate soil directly under the existing footing, thereby signifacantly reducing the thrust due to fdn load.  Push piers I like to use can be seen here: http://www.griptite.com/pushpier.html

You can't do a cut this deep without bracing it somehow. Too much of a risk for soil failure, even with clay. I just did a 24 foot excavation and used sheet piles which were braced at the top edge via steel beams.

RE: Foundations on clay terraced terrain

(OP)
yr right but how do i achieve bracing if the site is 40m wide? and by the way we ve no push piers over here. i guess i ve to rely on reinforced concrete piles driven into the terrain prior to excavation deep enough for good anchorage. about twice as much as the length for the cantilever arm.

RE: Foundations on clay terraced terrain

Braced sheet piles.  Use steel beams approximately 1m from the top to handle the forces.  Every so often, you'll have to put a strut in to cancel out the buildup of the shear.  You might be able to design it as a cantilevered sheet pile, but 8m is pretty significant.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close