×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Building Collapse

Building Collapse

RE: Building Collapse

So...dik....what was the ultimate cause of this collapse?  Anything coming out in the engineering community?

RE: Building Collapse

Maybe a gross simplification, but the wall was designed to hold cold air, not heavy stacks of frozen food. Looks like the wall consisted mostly of like nner and outer insulation on some widely spaced studs.  Obviously, there must have been some embedded columns or other means to support a snow load on the roof, but not much lateral resistance in that wall.

RE: Building Collapse

Typically, these types of cold storage facilities are unitized wall, floor and ceiling panels (preformed foam filled) locked together by camlocks. Internal/external  framework is provided to support the structure as necessary for wind and snow loads. Additional or combined structure is used to support the mass (product) internal load. All depends on the size of the facility.
Cold storage envelopes are mostly just that, and do not attempt to support the internal product loads.
It may be that, in this case, the product load exceeded the rating of the product supports, and upon failure a cascade of product precipitated into mass structural failure of the outer wall which could not contain the load.
Cold storage environment, an isolated area, minimal supervision, overloaded conditions..simply a bad connnection. You can speculate the cause. It is unfortunate that a life was lost.

pennpoint


    

RE: Building Collapse

(OP)
JAE:

It's a little early... I've put a call into a couple of our clients that are into insurance (ambulance chaser mode) to see if there has been any info...

With the fatality, it may be a long time before anything of substance is released...

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - Implementing a Multi-Domain System
IoT systems are multi-domain designs that often require AMS, Digital, RF, photonics and MEMS elements within the system. Tanner EDA provides an integrated, top-down design flow for IoT design that supports all these design domains. Learn more about key solutions that the Tanner design flow offers for successful IoT system design and verification. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close