×
INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

At what Stage Poured Concrete for a section starts carrying load?

At what Stage Poured Concrete for a section starts carrying load?

At what Stage Poured Concrete for a section starts carrying load?

(OP)
I intend to pour a R.C. Bridge structure supported on a flexible truss scaffolding in two pouring sequences. The first pour is rather a flexible slab section. After this pour has gained the design strength of the concrete, the second pour concrete is going to be poured. However, the amount of second pour concrete is about 300 cubic m. and would take atleast 10 hours to pour using two pumps. If part of this section sets while second stage pouring is being carried out and becomes stiff enough to carry the load then I think that the first poured slab section may become stiffer than before in relation with the flexible truss scafolding.

In order to analyse this problem I think it is necessry to know for me as to when this M40 grade concrete with initial setting time of 4.5 hours and final setting time of 7 hours becomes stiff enough to carry the load so that stresses can set up in second poured section.

I shall be grateful if you can answer my query.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Research Report - What’s the State of Nonlinear Simulation?
Simulation is an increasingly valuable tool across the product design workflow, but not all simulations are equal. We set out to determine how engineers and product designers make use of specialized analyses, how they incorporate nonlinear simulation into their work and how they rate the available software. Download Now
White Paper – Data Security and Know-How Protection
Our data is constantly exposed to the danger of being intercepted or stolen as it wends its way over global data networks. Data security measures and measures for protecting intellectual property should not, however, first be implemented when data is exchanged – companies must lay the foundation for these measures within their own organization. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close