INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Moment connection between wide flange and channels

Moment connection between wide flange and channels

Moment connection between wide flange and channels

(OP)
Does this work? I'm not 100% sure how the unbraced length would work; maybe each channel is fully unbraced, which would make it very hard to work with.

RE: Moment connection between wide flange and channels

The top and bottom flange of Channel restrained then would be ok to dive in the moment connx. direction,Since its like built tup section, the unbraced length can be more for your C-Channels. Is it not possible to use HSS?

RE: Moment connection between wide flange and channels

(OP)
It's not really a built up section. It's sandwiching some brick. It's more like two independent channels.

It might be possible to use HSS, but it would make the demolition sequence far more complicated. I'm just exploring this option because it saves $.

RE: Moment connection between wide flange and channels

Are you sawcutting into the brick to insert the channel flanges?

Is the entire channel moment taken by its web (and not the flanges)?

RE: Moment connection between wide flange and channels

(OP)
Yes, I am sawcutting into the brick to insert the flanges.

No, the channel is welded at the flanges. So I'm assuming web is for shear (even though it takes some moment) and flanges are for moment.

RE: Moment connection between wide flange and channels

Seems like it would work just fine on paper. I'm not sure about treating the channels as anything but unbraced, though.

Applying field welds from the flanges of the channels to the column seems pretty difficult in terms of access; particularly if they welds are full penetration.

I personally would probably push for the more expensive shoring/demo procedure and a more typical moment frame assembly, but that's mostly because I design masonry shoring pretty frequently and work with shoring contractors that are familiar with it.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close