INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Failure reporting of complex refractory structures

Failure reporting of complex refractory structures

Failure reporting of complex refractory structures

(OP)
My company has 6 quench towers in a very corrosive process. There's three different brick materials, 6 brick shapes, a fiberglass membrane, carbon steel shell etc.

Obviously when a blow out occurs its an easy failure to represent but how does one develop a common communication between sites to explain whether an inspection looked good or bad? "Mortar washout" and "cracked long bricks" don't exactly carry much weight and the only continuity for decision making on rebuilds is generational knowledge from seniors.

RE: Failure reporting of complex refractory structures

Quote (YungPlantEng)

Obviously when a blow out occurs its an easy failure to represent but how does one develop a common communication between sites to explain whether an inspection looked good or bad? "Mortar washout" and "cracked long bricks" don't exactly carry much weight and the only continuity for decision making on rebuilds is generational knowledge from seniors.
Did not understand. You should rewrite this in a simple manner.

RE: Failure reporting of complex refractory structures

YungPlantEng,

Do your co-workers understand your terminology? Chat with them and see if there are commonly recognized terms for everything. Every organization has jargon of some sort.

--
JHG

RE: Failure reporting of complex refractory structures

Maybe your inspection documents need a schematic or sketch along with the commonly used descriptions.
This would give each section a name and describe different common issues.
This would encourage a standard way of describing issues.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, consulting work welcomed

RE: Failure reporting of complex refractory structures

Whatever the problem is exactly, one of the most useful methods is comparison rating system. Take photos or impressions of these elements in their various stages of wear/failure and ensure everyone has those in hand when they perform the inspections.

Or do what most people consider obvious - send the same inspector(s) to inspect the quench towers when they come down for service.

RE: Failure reporting of complex refractory structures

Standardized Inspection Protocol:

Develop a comprehensive inspection protocol that offers clear, step-by-step instructions for conducting thorough assessments of quench towers. This protocol should encompass the equipment to be inspected, essential tools, and the recommended inspection frequency.

Inspection Checklist:

Create a detailed checklist that inspectors can use during their evaluations. This checklist should encompass all aspects of quench towers, including brick materials, shapes, membrane conditions, and shell integrity. Each component should be broken down into specific items to examine.

Grading System:

Implement a standardized grading or scoring system that enables inspectors to rate the condition of each component consistently. For instance, a numerical scale from 1 to 5 can be used, with 1 signifying excellent condition and 5 indicating severe damage or corrosion. This system streamlines the assessment process.

Photographic Documentation:

Mandate inspectors to capture photographs of critical areas or identified issues during inspections. Visual documentation is invaluable for conveying the actual condition and supporting decision-making.

Reporting Format:

Establish a uniform reporting format that includes a summary of findings, the inspection date, the inspector's identity, and a comprehensive breakdown of each component's condition. Utilize the grading system to categorize the severity of identified issues.

Standardized Terminology:

Develop a shared glossary or standard terminology that precisely defines quench tower components and associated issues. Ensuring uniform language usage guarantees accurate descriptions of conditions.

Training and Certification:

Offer training sessions to inspectors on the standardized inspection protocol, checklist, and grading system. Certification can be considered to verify the inspectors' qualifications for conducting assessments.

Centralized Data Repository:

Establish a centralized data repository or database to store inspection reports and accompanying photographs. Centralized data storage facilitates easy access to historical data and facilitates trend analysis.

Routine Review Meetings:

Conduct regular meetings involving inspectors, maintenance teams, and relevant stakeholders to review inspection findings. These meetings are essential for discussing maintenance and potential rebuild decisions based on the collected data.

Knowledge Preservation:

Institute a knowledge preservation program to capture the wealth of insights and experiences possessed by senior employees. Document their wisdom, anecdotes, and lessons learned over the years and make this invaluable resource accessible to the entire team.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close