Upper limit on f'c
Upper limit on f'c
(OP)
I'm getting cylinder results submitted that are all 1.6 to 1.8x f'c. Is there a code limit on exceeding f'c? Min reo check is ok.
If no limit, anything to know about lifting young concrete? It's hitting enough strength at under a day. Wondering if it hasn't gone off enough to be treated like older concrete.
If no limit, anything to know about lifting young concrete? It's hitting enough strength at under a day. Wondering if it hasn't gone off enough to be treated like older concrete.
RE: Upper limit on f'c
Some things like curing are dependent on age not strength. And it is possible that Concrete Modulus has not increased at the same rate.
I would be questioning the mix design.
RE: Upper limit on f'c