INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Number of hours to design excavation project

Number of hours to design excavation project

Number of hours to design excavation project

(OP)
Dear all

I would like to know from your experience the number of hours you put in to design an excavation project (less than 20m) assuming you have all geotechnical data, lab tests, and loads ready.

thanks
Replies continue below

Recommended for you

RE: Number of hours to design excavation project

What am i designing?

RE: Number of hours to design excavation project

(OP)
Diaphram wall or sheet pile wall etc...

RE: Number of hours to design excavation project

Is there available space behind wall to use tiebacks? If not do i need to hold discussions with neighboring property

RE: Number of hours to design excavation project

I'd find out what the wall costs to construct and charge 10% for engineering it.
Do you have any idea how much liability you're taking on? Literally millions of dollars. If someone gets killed, your lawyer fees might be more than a million dollars.

RE: Number of hours to design excavation project

List all of the tasks (e.g., site visit and travel expenses, plan and spec review, geotech report and borings review, number of design cases including intermediate cases, printing and mailing expenses, proposal preparation, reviewing design review comments, design revisions, CAD expense, etc.) that will be required and put hours and dollars to the design.

www.PeirceEngineering.com

RE: Number of hours to design excavation project

PEinc - the issue I had was that the OP was wanting you to do it all for them....

RE: Number of hours to design excavation project

any groundwater to account for?

RE: Number of hours to design excavation project

Quick answer, without knowing literally anything else except that it's a diaphragm wall or sheet pile wall: 60 hours design, 60 hours drafting.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close