Opening in concrete foundation
Opening in concrete foundation
(OP)
I am leaving a 2’-0”x 6’-0” opening in a foundation for conduit stub ups. These will not be encased in a ductbank, but in individual tubes coming up. How are the openings filled in after conduits are placed? Thank you.
RE: Opening in concrete foundation
You can cast the wall solid, and drill through for your conduits, remembering to place the reinforcing so it's not cut when you drill.
-----*****-----