INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Contact US

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Deductive Change Order and Overhead

Deductive Change Order and Overhead

Deductive Change Order and Overhead

(OP)
We are issuing a deductive change order. And the contractor is not including the overhead and profit in the cost proposal.
Our argument is they should because in the contract, it reads the following:

"For Work to be deleted by Change Order, the reduction of the Contract Sum shall be computed on the basis of one or more of the following: (i) Unit Prices stated in the Contract Documents; (ii) where Unit Prices are not applicable, a lump sum based upon the costs which would have been incurred in performing the deleted portions of the Work as calculated in accordance with Paragraph 6.06, supported by a Cost Proposal as required by Paragraph 6.03. Neither
Contractor nor the Subcontractor shall receive a markup on their respective Lower-Tier Subcontractors
to administer the credit Change Order. 1. When both additions and credits are involved in any one Change Order, Contractor's markup shall be computed on the basis of its direct costs and labor productivity for the net change in the quantity of the Work. For example, if a Change Order adds 14 units on one Drawing and deletes 5 units on another
Drawing, the markup shall be based on the net addition of 9 units. No markup will be allowed if the deductive cost exceeds the additive cost."

Since this is a unit price, we are expecting the costs..as calculated in paragraph 6.06. I am not going to include this paragraph but it has subparagraph A for labor, subparagraph B for Material, and subparagraph C for overhead and profit. Paragraph 6.06 treats overhead and profit as a cost so we believe the overhead and profit should included as part of this deductive change order.

RE: Deductive Change Order and Overhead

Some possible issues:

Is it a unit price contract. If so, are there unit rated for adding and deducting? If so, and then you have an ambiguity written into the contract and case law generally goes against the individual that drafted the contract. If a unit priced contract you have to be very careful when you evaluate the bids to ensure that the 'add' and 'deduct' values are realistic... if they are offering $100 to add an item, and $0.1 to deduct it... these are the terms of the contract. I was involved in one project where this was the case, and I identified the problem to the client, and he ignored the advice. At the end he really got hurt. I didn't tell him, but I was not at all sympathetic.

"When both additions and credits deletions are involved" another possible ambiguity...

"overhead and profit should included as part of this deductive change order" Hopefully in regards to the Contract, these items should be itemised.

It is then a matter of determining if the Change Order evaluation is consistent with the terms of the Contract. Different jurisdictions may treat this differently.



-----*****-----
So strange to see the singularity approaching while the entire planet is rapidly turning into a hellscape. -John Coates

-Dik

RE: Deductive Change Order and Overhead

you need to talk to a lawyer, not a bunch of engineers.

RE: Deductive Change Order and Overhead

A good contract administrator can usually work this out, and even more convoluted problems... if the contract admin cannot, then you need lawyers...

-----*****-----
So strange to see the singularity approaching while the entire planet is rapidly turning into a hellscape. -John Coates

-Dik

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

Low-Volume Rapid Injection Molding With 3D Printed Molds
Learn methods and guidelines for using stereolithography (SLA) 3D printed molds in the injection molding process to lower costs and lead time. Discover how this hybrid manufacturing process enables on-demand mold fabrication to quickly produce small batches of thermoplastic parts. Download Now
Design for Additive Manufacturing (DfAM)
Examine how the principles of DfAM upend many of the long-standing rules around manufacturability - allowing engineers and designers to place a part’s function at the center of their design considerations. Download Now
Taking Control of Engineering Documents
This ebook covers tips for creating and managing workflows, security best practices and protection of intellectual property, Cloud vs. on-premise software solutions, CAD file management, compliance, and more. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close