INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Road Pavement design for internal road network of factory building

Road Pavement design for internal road network of factory building

Road Pavement design for internal road network of factory building

(OP)
I got a job to design road Pavement for internal road network of factory building. They preferred Asplalt for surfacing. Are there any specific guidelines available for that?

PS: I'm highway design engineer, I know how to design public roads, here I want know about, are there any specific guidelines for traffic forecasting or traffic class evaluation for factories. Also what vehicle types need to consider. (ie. Fork lift)
Thanks for your valuable replies.
Replies continue below

Recommended for you

RE: Road Pavement design for internal road network of factory building

Have you ever designed a pavement?

There are many guidelines out there, depending on where you are located. In the US, AASHTO is the most common method used. Before you get starting on the design process you'll need to know a few things, such as:

What loads will be put on the pavement
How many times will those loads be repeated (frequency of loading)
What are the subgrade soil conditions
Where is the water table (will you need underdrains)
What is the availability of competent base material
What type of asphaltic concrete will be used
How will surface drainage be handled

As for design approaches, you have several options. You can use the common structural number approach, a traffic factor approach (Asphalt Institute method) or you can use elastic layer analysis.

RE: Road Pavement design for internal road network of factory building

As Ron has suggested there are many guides out there. Here in the UK and in the US. The vaugness of your question suggests you have no experience in this field and you need assistance from someone who does. Do you have a experienced engineer you can ask?
Ron has addressed the many factors related to the structural design of the road but you also need to consider, size of vehicles, horizintal (especially) and vertical alignment. types of kerbs, tunring points. junctions. drainage. Pedestrian safety and segregation.

RE: Road Pavement design for internal road network of factory building

Hire someone who know this field.
We had in plant roads, and they were designed for heavier loads that public streets.
Something to with having fork trucks that could carry 50,000lb loads, and unloaded they were about 60,000lb.

= = = = = = = = = = = = = = = = = = = =
P.E. Metallurgy, consulting work welcomed

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close