INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

concrete curing in impervious tank

concrete curing in impervious tank

concrete curing in impervious tank

(OP)
Hi,
I have an unique project requiring the curing of concrete cast in a fiberglass tank. I am designing a footing retrofit inside an existing fiberglass sewage wet well lift station. The concern of the client is time. The lift station retrofit needs to be completed as quickly as possible so that downtime is minimized. The plan is to install a spray on liner on the footing to prevent chemical corrosion of the concrete and steel. How can I determine the proper amount of curing time when the concrete can only cure to the top surface so that the spray on liner doesnt a) inhibit the curing, and b) the concrete doesnt continue to cure and shrink away from the liner. The liner company has been consulted and indicates 10-14 days, but I would like to hear other opinions.
- Soldierson
Replies continue below

Recommended for you

RE: concrete curing in impervious tank

Concrete curing intent is to reduce the amount of water escaping from the surface, instead of forming the cement water matrix. Water curing, liquid membranes and sheets all are applied to do this. So your spray on liner is actually a better curing situation than most. You should have no concerns.

RE: concrete curing in impervious tank

Don't they have moisture test kits in the flooring & coatings market?

RE: concrete curing in impervious tank

amount of shrinkage is dependant on mix design, you may be able to get more data from your concrete supplier on cure time, strength gain and shrinkage rate. shrinkage continues for years, so you need to determine how much is allowable. However, it is clear that the shrinkage will be very small and that quite a bit will occur in the first few days

https://insights.basf.com/files/pdf/Shrinkage_Of_C...

RE: concrete curing in impervious tank

(OP)
Thanks to all,
The curing concern is to prevent the liner from separating from concrete due to excess moisture. A local expert agreed with the moisture testing suggestion. We are developing a plan to monitor surface moisture and compare against the manufactucturers recommended moisture for liner application.
Soldierson

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login



News


Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close