I agree with AC that it is a function of speed, but locally we also use a rule of thumb transition length for overlay projects milled into the existing pavement equal to a length of 1" of vertical overlay to 20' of horizontal length for the depth of the Hot Mix Asphalt Surface Course. The pay item typically used is Butt Joint (Sq Yd) or Cold Milling - Variable Depth (Sq Yd).