INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Pump Requirements

Pump Requirements

Pump Requirements

(OP)
Residential building is 350m (1,200') from city water source (clean potable water only)
Elevation change is an increase of 30m (100')
Flow Rate: 10-15 GPM
Power source = Electric
Pipe: 2.5 cm (1") black poly pipe
Climate: Tropical: HI = 28.4 °C | 83.1 °F, LOW: 15.6 °C | 60.1 °F
Tank above building: 4 ton 1,056 GL) switched tank to turn off pump when full

Questions:
How many pumps would I need?
What is best type of pump to use in this case?
At two points, there are straight up 4m gains. Does that change requirements?

RE: Pump Requirements

Is the 30m head inclusive of the elevated tank?

It is a capital mistake to theorise before one has data. Insensibly one begins to twist facts to suit theories, instead of theories to suit facts. (Sherlock Holmes - A Scandal in Bohemia.)

RE: Pump Requirements

(OP)
Darn! I though I thought of everything.
Thank you for asking. 30m + 5m to top of tank

Head = 35m

RE: Pump Requirements

Just quickly without running any calcs. Think the 1" poly pipe is way undersized.

It is a capital mistake to theorise before one has data. Insensibly one begins to twist facts to suit theories, instead of theories to suit facts. (Sherlock Holmes - A Scandal in Bohemia.)

RE: Pump Requirements

15GPM in a 1inch pipe yields about 6ft/s thru the pipe. That's acceptable. But an 1-1/4' would probably be better if the cost doesn't change greatly.

Add about 0.4ft of head per foot for cramming that water thru the 1" pipe (friction head loss).

So your head is more yet! :)

Keith Cress
kcress - http://www.flaminsystems.com

RE: Pump Requirements

So depending on your flow and pipe size you probably need about 45 to 50m head at the inlet.

That's about 5 bar.

One pump will easily do this but you need to know what the flowing pressure is from the city supply to size the pump.

A simple centrifugal water pump will do this.

Note that city water suppliers are often reluctant to allow people to pump water out of their system and have rules to follow.

Remember - More details = better answers
Also: If you get a response it's polite to respond to it.

RE: Pump Requirements

15 USgpm thru 300 metres of 1" poly pipe gives you about 48 metre head loss plus static head of 35 equals 83 or so metres total head. Achievable with 1 centrifugal pump however increasing the pipe diameter is recommended and could be a better financial solution.
Can you pump directly from the town main or will you require a "break-tank" between the main and your pump.

It is a capital mistake to theorise before one has data. Insensibly one begins to twist facts to suit theories, instead of theories to suit facts. (Sherlock Holmes - A Scandal in Bohemia.)

RE: Pump Requirements

(OP)
After double checking, it appears the pipe is actually 3 cm.
This is rural Japan and the city recommends this solution so connecting is no problem.
Your responses have confirmed my suspicions. One contractor was quoting a need for 3 pumps.

Follow on questions.
1. With the 3cm pipe gain, what head loss can I expect?
2 Will two 90 degree pipe bends add even more head?
3. The GE elevation data below for area is old. The 91m point on the chart is actually closer to 100m but you get the idea.
Private property and city roads limit the pump location. It can be placed within 30m of source or within 80m of tank.
At what point along the run should the pump be placed?

RE: Pump Requirements

Your new location requirements, give-or-take elevations, new pipe dimensions, and other (we can imagine) aspects are painting a wonky bunch of data Katsuren. This is also starting to add up to some serious money. You should no longer be getting advice from us because very small details can easily derail the system resulting in bad performance, early failures, or a complete failure to launch.

At this point you should engage the services of a local pumping professional and/or a local water systems engineer who will know which small details need serious consideration in your project.

Keith Cress
kcress - http://www.flaminsystems.com

RE: Pump Requirements

You need to give a definite static head, not near enough- from the source to the highest delivery point.
A spec on the pipe, especially ID. is it high density or low density as pressure rating could be a problem.

It is a capital mistake to theorise before one has data. Insensibly one begins to twist facts to suit theories, instead of theories to suit facts. (Sherlock Holmes - A Scandal in Bohemia.)

RE: Pump Requirements

(OP)
Thank you all. You've been a great.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members! Already a Member? Login


Resources

White Paper - How ESI is Helping Move New Medical Device Product to Market Quicker & More Cost Effic
Early Supplier Involvement has long been a strategy employed by manufacturers to produce innovative products. Now, it almost seems like a necessity. Because decisions made in the design phase can positively affect product quality and costs, this can help add value to OEM bottom lines. This white paper will discuss many facets of ESI, including why it’s so valuable today, what challenges limit the benefits of ESI, how cost is impacted, and more. Download Now
White Paper - Moving to a Driverless Future
This white paper describes what we see as the best practices to support a sustainable engineering process for autonomous vehicle design. It exposes how to use simulation and testing in common frameworks to enable design exploration, verification and validation for the development of autonomous cars at a system, software and full-vehicle level to drive a mature product development process for automated driving. Download Now
Research Report - How Engineers are Using Remote Access
Remote access enables engineers to work from anywhere provided they have an internet connection. We surveyed our audience of engineers, designers and product managers to learn how they use remote access within their organizations. We wanted to know which industries have adopted remote access, which software they are using, and what features matter most. Download Now

Close Box

Join Eng-Tips® Today!

Join your peers on the Internet's largest technical engineering professional community.
It's easy to join and it's free.

Here's Why Members Love Eng-Tips Forums:

Register now while it's still free!

Already a member? Close this window and log in.

Join Us             Close